M. E. KESKİN Et Al. , "Examination timetabling problem with scarce resources: a case study," EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.12, no.6, pp.855-874, 2018
KESKİN, M. E. Et Al. 2018. Examination timetabling problem with scarce resources: a case study. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.12, no.6 , 855-874.
KESKİN, M. E., Doyen, A., Akyer, H., & GÜLER, M. G., (2018). Examination timetabling problem with scarce resources: a case study. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.12, no.6, 855-874.
KESKİN, Muhammed Et Al. "Examination timetabling problem with scarce resources: a case study," EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.12, no.6, 855-874, 2018
KESKİN, Muhammed E. Et Al. "Examination timetabling problem with scarce resources: a case study." EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.12, no.6, pp.855-874, 2018
KESKİN, M. E. Et Al. (2018) . "Examination timetabling problem with scarce resources: a case study." EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.12, no.6, pp.855-874.
@article{article, author={Muhammed Emre KESKİN Et Al. }, title={Examination timetabling problem with scarce resources: a case study}, journal={EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING}, year=2018, pages={855-874} }