A solution approach to a synchronisation problem in a JIT production system


Gundogar E., Yilmaz A., ERKAYMAN B.

Production Planning and Control, cilt.25, sa.12, ss.990-998, 2014 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 25 Sayı: 12
  • Basım Tarihi: 2014
  • Doi Numarası: 10.1080/09537287.2013.794984
  • Dergi Adı: Production Planning and Control
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
  • Sayfa Sayıları: ss.990-998
  • Anahtar Kelimeler: production system synchronisation, line stoppage, cycle time, root-cause analysis, JIT, JUST-IN-TIME, TOYOTA PRODUCTION SYSTEM, MODEL ASSEMBLY-LINE, CYCLE TIME, SEQUENCING PROBLEM, WAFER FABRICATION, KANBAN SYSTEM, PERFORMANCE, MANAGEMENT, REDUCTION
  • Atatürk Üniversitesi Adresli: Evet